Maybrey Works is a Bellway Development that we worked on in partnership with London Drylining. It consists of 159 flats ranging from 1,2 and 3 bedrooms.

Specification: 

Ground Floor – The ground floor commercial/communal areas build up was 1200g DPM, 120mm Kingspan K103, 25mm Perimeter Upstand, 500g Separating Layer, Orlitech Mesh and 80mm Fibre-Screed. We also completed the bin stores with 1200g DPM, 100mm EPS, 500g Separating Layer, 8mm Perimeter Strip, Mesh and 100mm Concrete laid to falls with a brushed finish.

Upper Floors – Level 1 build-up consisted of 1200g DPM, 110mm Kingspan K103, 500g Separating Layer and a 65mm Tarmac Topflow Screed A. All the levels above had Yelofon HD10+ acoustic insulation, 500g Separating Layer and a 50mm Tarmac Topflow Screed A.